Manhattan renovation
Filed 12 days ago · Alteration · Grade A+ · Mid stage · No general contractor named on permit
Reach-1: PS27.5 sheet piles, soil-mix trench seepage barrier, micropiles, 3' dia drilled shafts, open cut excavation, 4" stabilization slab, flowable fill/jet grout. Sheeting/shoring deferred under separate DOB filing
19K
square feet
1
filings to date
Why this may be worth pursuing
Filed 12 days ago. No general contractor is named on permit; 2 engineering firms are identified, and 2 anticipated permit categories have not yet appeared.
Filing status does not indicate whether the work has been awarded.
Anticipated permit categories not yet filed
Roofing & waterproofingSite & structure
Based on the project scope and filing history. Filing status does not indicate whether the work has been awarded. Categories already covered by a firm on the filing are excluded.
Firms on the filing
EngineeringHIRANI ENGINEERING AND LAND SURVEYI
Engineering2 firms
No general contractor named on permit
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
1 filing on record, first filed Aug 2026, latest activity Sep 2026.
Dated, itemized filing history is part of the paid product.
Not shown on this page
Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Pro or Team · $0 today · cancel anytime
Previous project$22.0M Manhattan renovation
2 of 3 select projects
Next project$455K Queens demolition
Sourced from New York City Department of Buildings public filings.