| City | Permits filed | High-priority | |
|---|---|---|---|
| New York City | 1,404 | 633 | View → |
| Chicago | 272 | 60 | View → |
| San Francisco | 269 | 17 | View → |
| Miami-Dade | 123 | 32 | View → |
| Total | 2,068 | 742 |
Based on public permit filings reviewed by PermitPipeline. High-priority means graded A+ or A for contractor fit. Counts reflect available filing data and PermitPipeline's active-project rules as of the updated date.
What subcontractor bidding sites are
Subcontractor bidding sites are platforms where specialty trades find projects to bid. Most are invite-to-bid systems: a general contractor packages a project and distributes bid invitations, and subs on the list respond. They are useful once a project is already out for bid. The limitation is timing: by the time a package reaches these sites, the GC is chosen, the scope is set, and you are one of several trades quoting the same work.
The timing problem for subcontractors
Waiting for an invitation puts you at the end of the line. The GC has already been selected, so you are competing on price against every other sub who got the same package. If you want a better position, you need to see the project earlier, while the team is still forming, so you can build a relationship with the GC or owner before the bid list is set. See our broader guide to construction bidding websites for how the categories fit together.
How permit-backed leads help subcontractors get in earlier
A permit filing shows a project forming before it is packaged for bidding, during the pre-bid window. For a sub, that is a chance to spot projects that will need your trade, see the likely GC or owner, and identify the right relationship path earlier, whether that is the GC, owner, architect, or an existing partner. PermitPipeline reads public permit filings and ranks projects by the signals that matter to a trade:
| Signal | Why it matters to a sub |
|---|---|
| Scope and work type | Whether the project is likely to need your trade at all. |
| Declared value and size | Whether the job is worth pursuing for your shop. |
| Filing date and stage | How early you are, and whether the GC is likely still being chosen. |
| GC and owner signals | Who to build a relationship with before the bid list forms. |
| City and address | Whether the job is in a market you serve. |
What it looks like by trade
- Electrical: service upgrades, tenant improvements, commercial alterations.
- HVAC and mechanical: restaurant buildouts, office renovations, equipment replacements.
- Plumbing: commercial tenant improvements, multifamily renovations, restaurant permits.
- Concrete and site: larger alterations, foundation and structural scope where it is visible in the filing.
What subs can do with an early permit signal
- Track the project as it develops.
- Identify owner, architect, and GC signals.
- Watch for the GC assignment.
- Reach existing GC relationships already bidding the job.
- Prepare for likely bid timing.
- Avoid pursuing work outside your trade or market fit.
Not for every sub. This is best for trades that sell into commercial, multifamily, retrofit, tenant-improvement, and larger renovation work. It is less useful for emergency or home-service work.
Who it is for
- Specialty trades that want to see projects forming before the invitation arrives.
- Trade estimators and BD building a weekly pursuit list instead of waiting on packages.
- Shops that sell to GCs and want to be in the conversation before the bid list is set.
For the role overview, see subcontractor leads from permit data.
See permit-backed projects that match your market
Start a free 14-day trial and see current filings scored for your market. No charge for 14 days.
Start free 14-day trial →Frequently asked
What are subcontractor bidding sites?
Platforms where specialty trades find projects to bid, usually invite-to-bid systems where general contractors distribute bid packages. They are useful once a project is packaged for bidding.
How do permit-backed leads help a subcontractor?
Permit filings show a project forming before the bid list is set. For a sub, that is a chance to identify projects that will need your trade, see the likely GC or owner, and line up the right relationship earlier, instead of waiting for an invitation.
Is PermitPipeline a subcontractor bidding site?
No. PermitPipeline is early project intelligence from permit filings, not an invite-to-bid platform. It helps trades find projects earlier and does not replace the bidding platforms you already use.
Invitation to bid vs early permit signal
| Invitation to bid | Early permit signal | |
|---|---|---|
| Timing | after the package is set | at or just after filing, earlier |
| How you get it | the GC sends it | you find it in the public record |
| Competition | bid list is forming | often before the list forms |
| Best use | respond and price | research and position early |