$638K Chinatown renovation
Filed 4 months ago · otc alterations permit
12th floor: deferred mechanical + electrical permit. permit. mechanical selective demolition + cap of med to low pressure ductwork. new distribution for vav boxes, new hot water reheat distribution piping air balanceā¦
$638K
declared value
3
filings to date
Project scope
12th floor: deferred mechanical + electrical permit. permit. mechanical selective demolition + cap of med to low pressure ductwork. new distribution for vav boxes, new hot water reheat distribution piping air balance. electrical new power + signal devices throughout. new 2022 t24 complaint lighting + controls
Why this may be worth pursuing
Filed 4 months ago, with a declared value of $638K. A general contractor is named on the filing; 2 architecture firms are identified, an engineering firm is identified.
Firms on the filing
General contractorGolden Gate Fire Protection Inc
Architecture2 firmsEngineering1 firmGeneral contractor1 firm
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
3 filings on record, first filed Nov 2025, latest activity Mar 2026.
Dated, itemized filing history is part of the paid product.
Not shown on this page
Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Choose Brief, Pro or Team · 14-day trial
Previous project$561K Financial District/South Beach renovation
3 of 3 select projects
Sourced from San Francisco Department of Building Inspection public filings.