$13K Castro/Upper Market renovation
Filed Jun 2025 · otc alterations permit
Rebuild an existing nfpa13 fire sprinkler system on 2nd,3rd, and 4th floor only. no change made to the existing fire sprinkler system at the 1st level. (no work in the 1st level. existing monitoring system. ref and fireā¦
$13K
declared value
1
filings to date
Project scope
Rebuild an existing nfpa13 fire sprinkler system on 2nd,3rd, and 4th floor only. no change made to the existing fire sprinkler system at the 1st level. (no work in the 1st level. existing monitoring system. ref and fire sprk
Why this may be worth pursuing
Filed Jun 2025, with a declared value of $13K. A general contractor is named on the filing.
Firms on the filing
General contractorJcp Fire Protection
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
1 filing on record, first filed Jun 2025.
Dated, itemized filing history is part of the paid product.
Not shown on this page
Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Choose Brief, Pro or Team · 14-day trial
1 of 3 select projects
Next project$10K Noe Valley renovation
Sourced from San Francisco Department of Building Inspection public filings.