$10K Castro/Upper Market renovation
Filed Mar 2025 · otc alterations permit
Rebuild ongrade stairs from rear yard to corridor north side of bldg.connect existing footing at south west corner of building,add insulation at crawl space of 1st floor. rebuild exisitng exterior deck at ground floor…
$10K
declared value
1
filings to date
Project scope
Rebuild ongrade stairs from rear yard to corridor north side of bldg.connect existing footing at south west corner of building,add insulation at crawl space of 1st floor. rebuild exisitng exterior deck at ground floor level, replace 3 windows at 1st floor front of building
Why this may be worth pursuing
Filed Mar 2025, with a declared value of $10K. A general contractor is named on the filing; an architecture firm is identified.
Firms on the filing
General contractorGabriel Mena
Architecture1 firm
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
1 filing on record, first filed Mar 2025.
Dated, itemized filing history is part of the paid product.
Not shown on this page
Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Choose Brief, Pro or Team · 14-day trial
Previous project$300K Pacific Heights HVAC upgrade
3 of 3 select projects
Sourced from San Francisco Department of Building Inspection public filings.