PermitPipeline
Firms › SF general contractors › Em Electrical › Noe Valley renovation

Noe Valley renovation

Filed Jul 2025 · No general contractor named on permit

Relocate subpanel to new location (3 ft. from original loaction). relocate circuits from old bathroom area to new bathroom location. install new bathroom vent fan and hand blower circuit. (3) 20 amp, (1) 15 amp, (4)…

2
filings to date

Project scope

Relocate subpanel to new location (3 ft. from original loaction). relocate circuits from old bathroom area to new bathroom location. install new bathroom vent fan and hand blower circuit. (3) 20 amp, (1) 15 amp, (4) circuits, 30/30 panels/switchboards. work done in commercial area

Why this may be worth pursuing

Filed Jul 2025. No general contractor is named on permit; a specialty contractor firm is identified.

Firms on the filing

Specialty contractorEm Electrical Specialty contractor1 firm No general contractor named on permit

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

2 filings on record, first filed Jul 2025. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Start 14-day trial →
Pro or Team · $0 today · cancel anytime

Sourced from San Francisco Department of Building Inspection public filings.