PermitPipeline
FirmsNYC general contractorsDBF STUDIO INC$50K Manhattan multifamily renovation

$50K Manhattan multifamily renovation

Filed 1 month ago · Alteration · Grade B · Mid stage

REMOVE EXISTING WASHING MACHINE AND CAP ALL CONNECTIONS BACK TO SINK BRANCH PIPING IN STERILIZATION AREA. NEW VACUUM, WATER, AND MEDICAL AIR PIPING TO (3) NEW DENTIST CHAIRS. NEW GRAVITY WASTE DRAINAGE FROM (3) NEW…

$50K
declared value
52
units
1K
square feet
2
filings to date

Project scope

REMOVE EXISTING WASHING MACHINE AND CAP ALL CONNECTIONS BACK TO SINK BRANCH PIPING IN STERILIZATION AREA. NEW VACUUM, WATER, AND MEDICAL AIR PIPING TO (3) NEW DENTIST CHAIRS. NEW GRAVITY WASTE DRAINAGE FROM (3) NEW DENTIST CHAIRS

Why this may be worth pursuing

Filed 1 month ago, with a declared value of $50K. A general contractor is named on the filing; 2 engineering firms are identified, and 2 anticipated permit categories have not yet appeared.

Filing status does not indicate whether the work has been awarded.

Anticipated permit categories not yet filed

FinishesFire protection

Based on the project scope and filing history. Filing status does not indicate whether the work has been awarded. Categories already covered by a firm on the filing are excluded.

Firms on the filing

General contractorDBF STUDIO INC Engineering2 firms

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

2 filings on record, first filed Jun 2026. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Unlock full project details →
Choose Brief, Pro or Team · 14-day trial

Sourced from New York City Department of Buildings public filings.