Hayes Valley renovation
Filed 5 months ago · additions alterations or repairs · Grade D · Mid stage
Rev to reconcile architectural floor plans re-issue (1b) and (1c). 6th floor interior non-structural architectural revision to incorporate(e) storage room apprx 300 sqft. into the adjacent assemply place along with…
4
filings to date
Project scope
Rev to reconcile architectural floor plans re-issue (1b) and (1c). 6th floor interior non-structural architectural revision to incorporate(e) storage room apprx 300 sqft. into the adjacent assemply place along with minor interior partition plan adjustments. work is
Why this may be worth pursuing
Filed 5 months ago. A general contractor is named on the filing; an architecture firm is identified, an engineering firm is identified.
Firms on the filing
EngineeringZfa Structural Enginers
Architecture1 firmGeneral contractor3 firmsEngineering1 firm
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
4 filings on record, first filed Mar 2025, latest activity Feb 2026.
Dated, itemized filing history is part of the paid product.
Not shown on this page
Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Choose Brief, Pro or Team · 14-day trial
Previous project$15.0M Hayes Valley tenant improvement
3 of 3 select projects
Sourced from San Francisco Department of Building Inspection public filings.