$50K Presidio Heights renovation
Filed 1 month ago · otc alterations permit · No general contractor named on permit
Replace two existing 4,000 mbh gas-fired hot water boilers with four new 1,999 mbh high-efficiency boilers. replace (e) 210 gallon indirect hot water heater with new of same capacity. miscellaneous piping modifications…
$50K
declared value
1
filings to date
Project scope
Replace two existing 4,000 mbh gas-fired hot water boilers with four new 1,999 mbh high-efficiency boilers. replace (e) 210 gallon indirect hot water heater with new of same capacity. miscellaneous piping modifications. no increase in gas loads. not decrease in gravity loads
Why this may be worth pursuing
Filed 1 month ago, with a declared value of $50K. No general contractor is named on permit; an engineering firm is identified.
Firms on the filing
EngineeringDiseno
Engineering1 firm
No general contractor named on permit
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
1 filing on record, first filed Jun 2026.
Dated, itemized filing history is part of the paid product.
Not shown on this page
Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Choose Brief, Pro or Team · 14-day trial
Previous project$847K Financial District/South Beach tenant improvement
3 of 3 select projects
Sourced from San Francisco Department of Building Inspection public filings.