PermitPipeline
Firms › SF architects & engineers › Taylor Engineers › $500K-$1M Financial District/South Beach…

$500K-$1M Financial District/South Beach HVAC upgrade

Filed 1 month ago · otc alterations permit · Grade A · Mid stage · No general contractor named on permit

Alteration to the existing mechanical. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and…

$500K-$1M
value range
1
filings to date

Project scope

Alteration to the existing mechanical. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb…

Why this may be worth pursuing

Filed 1 month ago, in the $500K-$1M range. No general contractor is named on permit; 2 architecture firms are identified.

Firms on the filing

EngineeringTaylor Engineers Architecture2 firms No general contractor named on permit

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

1 filing on record, first filed Sep 2026. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Start 14-day trial →
Pro or Team · $0 today · cancel anytime

Sourced from San Francisco Department of Building Inspection public filings.