Sunset/Parkside new building
Filed 1 month ago · new construction wood frame · Grade A · Mid stage
Revision to. clarity deferred submittal note on title sheet. 13d sprinkler system to be provided
3
filings to date
Why this may be worth pursuing
Filed 1 month ago. A general contractor is named on the filing; an architecture firm is identified, an engineering firm is identified.
Firms on the filing
General contractorActually Design Build Inc
Architecture1 firmEngineering1 firm
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
3 filings on record, first filed Dec 2025, latest activity Jun 2026.
Dated, itemized filing history is part of the paid product.
Not shown on this page
Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Choose Brief, Pro or Team · 14-day trial
Sourced from San Francisco Department of Building Inspection public filings.