PermitPipeline
FirmsSF architects & engineersNabih Youssef Associates$2.4M Mission Bay tenant improvement

$2.4M Mission Bay tenant improvement

Filed 4 months ago · additions alterations or repairs

Tenant improvement for sierra located on levels 1, 5 & 6. selective demolition of portion of (e) floor slabs at levels 5 & 6 to create 3 story, interconnected volume intended for "all-hands" assembly gatherings, work…

$2.4M
declared value
1
filings to date

Project scope

Tenant improvement for sierra located on levels 1, 5 & 6. selective demolition of portion of (e) floor slabs at levels 5 & 6 to create 3 story, interconnected volume intended for "all-hands" assembly gatherings, work also includes construction of stadium-styled seating & associated stairs between level 4, 5 & communicati

Why this may be worth pursuing

Filed 4 months ago, with a declared value of $2.4M. A general contractor is named on the filing; an architecture firm is identified.

Firms on the filing

EngineeringNabih Youssef Associates Architecture1 firmGeneral contractor1 firm

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

1 filing on record, first filed Mar 2026. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Unlock full project details →
Choose Brief, Pro or Team · 14-day trial

Sourced from San Francisco Department of Building Inspection public filings.