PermitPipeline
Firms › SF architects & engineers › Acco Engineering System › Financial District/South Beach commercial…

Financial District/South Beach commercial renovation

Filed 7 days ago · otc alterations permit · Grade A · Mid stage

Provide 2025 cbc i010.2.12.1 compliance for a new tenant that is going to lock- elev. lobby doors on fl 14. the bldg is an existing hi-rise w/c has on exisitng bldg wide 2-way comm system. the existing system is…

5
filings to date

Project scope

Provide 2025 cbc i010.2.12.1 compliance for a new tenant that is going to lock- elev. lobby doors on fl 14. the bldg is an existing hi-rise w/c has on exisitng bldg wide 2-way comm system. the existing system is absolutly is no longer supported by the mfg

Why this may be worth pursuing

Filed 7 days ago. A general contractor is named on the filing; a design firm is identified, an architecture firm is identified.

Firms on the filing

EngineeringAcco Engineering System Design1 firmArchitecture1 firmGeneral contractor1 firm

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

5 filings on record, first filed May 2026, latest activity Sep 2026. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Start 14-day trial →
Pro or Team · $0 today · cancel anytime

Sourced from San Francisco Department of Building Inspection public filings.