Drake Construction
General contractor · San Francisco permit activity
General contractor active in San Francisco construction, tracked from public building-permit filings.
#849
by SF filing activity
among SF general contractors, last 90 days
8
projects tracked
Jan 2025 to Jul 2026
2/16
active weeks
weeks with a filing (last 16)
1 of the 8 Drake Construction projects filed new permits in the last 30 days.
Start your 14-day trialSelect Drake Construction projects
$100K Presidio Heights renovation
Filed 27 days ago · 2 filings · Drake Construction: GC
& to obtain final inspection for work approved under &. all work is complete
GC named
View project details →
$50K Presidio Heights renovation
Filed Mar 2025 · Drake Construction: GC
Remove wall between dining & kitchen. replace windows in family & kitchen. relocate partitions for new bath location. replace (e) direct…
GC named · Engineer identified
View project details →
$1K Financial District/South Beach renovation
Filed Jun 2025 · Drake Construction: GC
130: new exterior signage over suite entrance. non-electrical (junbi matcha & tea)
GC named · Architect identified
View project details →
5 more
Drake Construction projects with project intelligence
Scopes, values, teams and filing history for every one
Start your 14-day trial →
Neighborhood, filing date, scope and declared value are shown here. Exact addresses,
owner and contact details and full filing histories are part of the paid product.
8 project records for Drake Construction: addresses, values, project teams
Start 14-day free trial
Middle 50% of declared values: $12K–$50K (median $30K)
Most recent filing: Presidio Heights · Jul 10, 2026
1 active · 0 newly observed last 90 days
Filing activity · last 16 weeks
APR
MAY
JUN
JUL
1
active projects (last 90d)
0
newly observed (last 90d)
Jul 2026
peak month
Project mix · by use
Commercial14%
Residential86%
Geography · by neighborhood
Presidio Heights33%
Castro/Upper Market17%
Financial District/South Beach17%
Hayes Valley17%
Pacific Heights16%
Shared-project connections
| # | Firm | Primary role | Shared | Relative |
|---|---|---|---|---|
| 1 | Caha Design Group | Architecture | 2 | |
| 2 | David Yadegar, Pe | Engineering | 1 | |
| None on shared filings. | ||||
Firms that appear on the same San Francisco permit filings. Association on shared filings, not a proven working relationship.
Frequently asked questions
How many SF projects has Drake Construction filed?▾
PermitPipeline tracks 8 San Francisco building-permit projects for Drake Construction (Jan 2025 to Jul 2026). 1 had filing activity in the last 90 days.
Does Drake Construction work on commercial or residential projects?▾
Across its tracked San Francisco filings, 14% of Drake Construction's projects are commercial and 86% are residential (multifamily, small residential, or single-family). Based on permit records, not self-reported.
Where in San Francisco does Drake Construction work?▾
25% of Drake Construction's tracked San Francisco projects are in Presidio Heights.
What is a typical Drake Construction project worth?▾
Across the 9 tracked projects with a declared value, Drake Construction averages $29K per project (declared value on the permit filing, not contract value).
Which firms does Drake Construction work with most often?▾
Drake Construction most frequently appears on the same San Francisco permit filings as Caha Design Group, David Yadegar, Pe. Appearing together indicates association on shared filings, not a proven working relationship.
Is Drake Construction a general contractor?▾
Drake Construction is listed as a general contractor on its San Francisco permit filings. Roles on this profile are derived from the role each firm holds on public DOB filings.
Public aggregate — full project records are part of the paid leads product. Updated daily from SF DBI filings.
Firm directories by market